Alarms
Power plant components
DC power room
Power cabinets
AC input voltages AC input currents DC output voltage DC output current Load sharing Battery float voltage
Check and record DC power room ambient temperature and verify proper operation of ventilation equipment Verify operation of system ventilation fans and replace fan filters Remove all foreign debris from all equipment compartments where applicable
Check all electrical connections for signs of
heat and general condition. Perform complete thermal scan of all possible electrical connections.
Documentation of inspection with recommendations for any corrective action deemed necessary will be provided will be provided on both Minor and Major PMs |